Business and Economics

Engineering Economics Practice Exam, Flashcards & Questions

Master foundational to advanced Engineering Economics with 1,174 verified curriculum items, worked engineering solutions, and spaced-repetition cards.

912 Total Questions 184 MCQs 564 Calculations 36 Formulas 128 Flashcards
Free Interactive Preview

Engineering Economics Sample Exam Questions & Rationale

Preview official questions below. The complete pool of 912 items is available in the offline app.

Question 1 of 4 Annuity due

A commercial lease requires payments of \$4,000 at the beginning of each year for 4 years. At an interest rate of 8%, calculate the present worth of this lease agreement.

A \$13,850.20
B \$15,000.00
C \$13,248.51
D \$14,308.39
Accepted Answer: Option D (\$14,308.39)

Rationale: **Given:** Payment $A = \$4{,}000$, $n = 4$ years, $i = 0.08$, $(P/A, 8\%, 4) = 3.312127$. **Formula:** P_{\text{due}} = A(P/A, i, n)(1 + i) **Calculation:** P_{\text{due}} = 4000 \times 3.312127 \times 1.08 = 13248.51 \times 1.08 = \$14{,}308.39 **Answer:** The present worth of the annuity due is \$14,308.39.

Question 2 of 4 Capital recovery factor

A manufacturing firm takes an \$80,000 term loan to install solar panels at 8% compound annual interest over 5 years. What equal annual payment A is required to fully pay off the loan?

A \$21,500.20
B \$19,250.00
C \$20,036.48
D \$16,000.00
Accepted Answer: Option C (\$20,036.48)

Rationale: **Given:** Loan amount $P = \$80{,}000$, interest rate $i = 0.08$, term $n = 5$ years, $(A/P, 8\%, 5) = 0.250456$. **Formula:** A = P(A/P, i, n) = P \left[\frac{i(1 + i)^n}{(1 + i)^n - 1}\right] **Calculation:** A = 80000 \times 0.250456 = \$20{,}036.48 **Answer:** The annual debt service payment is \$20,036.48.

Question 3 of 4 Deferred annuity

A software license provides annual savings of \$6,000 for 4 years, with the first payment occurring at the end of Year 4. At an interest rate of 8%, what is the present worth at time t = 0?

A \$19,872.76
B \$15,775.65
C \$16,210.40
D \$14,500.00
Accepted Answer: Option B (\$15,775.65)

Rationale: **Given:** Annual cash flow $A = \$6{,}000$, number of payments $n = 4$, deferral period $J = 3$ years, interest rate $i = 0.08$. **Formula:** P_0 = A(P/A, i, n)(P/F, i, J) = A(P/A, i, n)(1 + i)^{-J} **Calculation:** P_3 = 6000 \times (P/A, 8\%, 4) = 6000 \times 3.312127 = 19872.76. P_0 = 19872.76 \times (1.08)^{-3} = 19872.76 \times 0.793832 = \$15{,}775.65. **Answer:** The present worth at time zero is \$15,775.65.

Question 4 of 4 Geometric gradient series

An engineer's salary starts at \$10,000 in Year 1 and increases by 5% each year for 4 years ($g = 0.05$). At an interest rate of 10% ($i = 0.10$), what is the present worth of this compensation?

A \$36,000.00
B \$34,192.60
C \$32,800.40
D \$35,500.00
Accepted Answer: Option B (\$34,192.60)

Rationale: **Given:** Initial payment $A_1 = \$10{,}000$, growth rate $g = 0.05$, discount rate $i = 0.10$, term $n = 4$ years. **Formula:** P = A_1 \left[\frac{1 - (1 + g)^n (1 + i)^{-n}}{i - g}\right] **Calculation:** P = 10000 \times \left[\frac{1 - (1.05/1.10)^4}{0.10 - 0.05}\right] = 10000 \times \left[\frac{1 - 0.829037}{0.05}\right] = 10000 \times 3.41926 = \$34{,}192.60 **Answer:** The present worth of the geometric gradient series is \$34,192.60.

Active Recall Spaced Repetition Cards (Preview)

Card 1 • Annuity due
The present worth of an annuity due is related to an otherwise identical ordinary annuity by the factor {{c1::(1 + i)}}.
Because every payment in an annuity due occurs one period earlier, each payment earns one additional period of interest: P_due = P_ordinary * (1 + i).
Card 2 • Capital recovery factor
P into an equivalent uniform series A over n periods and is written as {{c1::(A/P, i, n) = [i * (1 + i)^n] / [(1 + i)^n - 1]}}.
The factor represents the annual sum of depreciation recovery and return on unrecovered capital.

Engineering Economics Curriculum Modules & Topics Covered

Modules
Time ValueDecision AnalysisAnnuities and GradientsDepreciation and TaxesBonds and Capital FinancingCost Estimating and Economy StudiesEngineering Economics
Core Exam Topics
  • Interest factors
  • Present worth
  • Annual worth
  • Rate of return
  • Simple and compound interest
  • Nominal and effective interest rates
  • Continuous compounding
  • Cash flow diagrams
  • Depreciation methods
  • Engineering break-even analysis
Learning Objectives
  • Develop core conceptual recall and analytical problem-solving in Time Value.
  • Develop core conceptual recall and analytical problem-solving in Decision Analysis.
  • Develop core conceptual recall and analytical problem-solving in Annuities and Gradients.
  • Develop core conceptual recall and analytical problem-solving in Depreciation and Taxes.
  • Develop core conceptual recall and analytical problem-solving in Bonds and Capital Financing.

Free Downloadable Engineering Economics Study Packs (.ZIP / .TSV)

Full Spreadsheet Data (TSV)
TSV • 912 items
Complete Course Pack
ZIP • 912 items
Elements (Complete)
ZIP • 912 items
Elements (Mastery)
ZIP • 912 items
Elements (Standard)
ZIP • 912 items
Active Recall Flashcards
ZIP • 912 items
Formula Codex
ZIP • 912 items
Problem Solving (Complete)
ZIP • 912 items
Problem Solving (Mastery)
ZIP • 912 items
Problem Solving (Standard)
ZIP • 912 items
Accounting (727) Battery Thermal Management Systems (BTMS): Liquid Cooling, Heat Pipes & Thermal Runaway (80) Business Law (276) Construction Management & Engineering (1,211) Corporate Finance & Capital Markets (3,389) Economics & Finance (5,314)
Full Question Pool: 912 Verified Items

Unlock All 912 Engineering Economics Practice Questions

Study the full question pool with 13 active recall battle modes, FSRS v5 spaced repetition, and 1-click printable PDF mock exams with full answer keys on Android and Windows PC.

Get on Google Play (Android) Get on Microsoft Store (Windows PC)